CURRENT WATER PROJECTS
Borehole Truck Arrives On-Site
Borehole truck preparing to drill
Borehole truck drilling over 200 feet below the earths surface
Nantong-Sapalo, Greenhouse Irrigation System
Special thanks to www.TheSkanner.com
BEGAN - October 2024 / Complete March 2025
Installation of water pump / cable, rope and pipe
Display of Greenhouse frames
The G.A.V.E. Water Project has begun construction for the Adzokoe-Peki village as of November 28, 2024
This project is complete JAN 2025 - Praise the Lord! 3000 villagers with water in the village
George Arhin team arriving onsite Peki village
The Borehole team meets the Adzokoe-Peki Chief to discuss the G.A.V.E. Water project
This village had an existing covered/inoperable borehole. No drilling necessary. This cuts down the project costs. This inoperable pump will be dismantled and a new solar powered pump installed. The aquifer has tested good!
Excavation has begun
Platform construction is in progress.
Junior High School students of Adzokoe-Peki are assisting with gravel collection for filling the platform that will hold the 2x10k liter water storage tanks
December 30, 2024 - The Polytanks are on site and placed. Last step is to install the pump now that all components are secured
Old pump dismantled ready for new solar-powered pump
January 3, 2025 - The G.A.V.E. Water project is installed and operational - Thank God!!
A family of men and boys fetching water. Normally this activity is for the women and girls. I asked why men and boys are fetching water - hear response below
January 3, 2025 - A couple of teen girls from the village using the newly installed water facility - The walk for water has ended. Praise God! Water commissioning pictures coming early next week.
G.A.V.E PROJECT QUOTES
Current - Irrigation system Nantun Sapalo Village
Recently completed - Adzokoe-Peki Village
Recently completed - Akonoma Village
Akonoma Village Quote for G.A.V.E. Water project 99,0005.00 GHS = 6,334.29 USD
Borehole survey/geological study
Borehole drilling and well construction
Solar powered water pump installation
Solar panel installation
Water Storage Tank installation
Water storage tank platforms
Brafoyaw Village Quote for G.A.V.E. Water project 101,585.00 GHS = 6,482.77 USD
Borehole survey/geological study
Borehole drilling and well construction
Solar-powered water pump installation
Solar panel installation
Water Storage Tank installation
Water storage tank platforms
CANCELLED Due to poor aquifer.
Below is a request for an irrigation system for a greenhouse in Tamale, Ghana
Below it the quote for installing the G.A.V.E. Water Project in the Azodoke-Peki village - 84.085.00 GHS = 5,146.00 USD
NOTE: This village had an existing inoperable borehole so NO DRILLING Required! Reduces project cost
Below is the quote for the water irrigation system in the volta region
UPCOMING WATER PROJECTS
Village Name:
Adzokoe-Peki Village - COMPLETE - JAN 2025
Brafoyaw Village - Raising funds - Cancelled - Aquifer is not good
Nantong-Sapalo, Greenhouse Irrigation System- COMPLETE - MAR 2025
Akonoma Village COMPLETE - OCT 2024
Village Location:
Volta Region
Tamale
Cape Coast
Village Contact:
Innocent Kelvin Coffie
Abubakar Sadiq Mohammed
Mr. Samuel Yawson
Numer of Villagers
Over 3,000
Over 4,000
Over 10,000
October 2024 - It was determined after 20 drilling attempts in Brafoyaw village that the aquifer is not good so this village project is cancelled.
September 2024
Both of these villages are located just outside of Cape Coast in the Central region of Ghana. They are both in need of the G.A.V.E. Water Package: Borehole, Solar Panel, Water Pump, 2x 10k liter Water Storage Tanks and the platform for the tanks
Akonoma Village has a school in the village and the water package will assist greatly - Nearing completion
Brafoyaw Village has a clinic that needs completing. Once done the Government will supply doctors, nurses and medical equipment. See Quote (forthcoming) - Please Donate
Videos and photos of the current water irrigation system in the Volta region.
2024 COMPLETED PROJECTS
October 14th, 24. Akonoma school children thanking G.A.V.E. Foundation for a completed water project!
The Akanoma Village G.A.V.E. Water project is in progress:
The Borehole truck arrived on-site and began drilling
Water is present
Water Pump is installed
Platform construction in progress
Solar Panels procured
Poly tanks onsite and platform construction almost complete

Recently Completed Project
Janikura village water pump replacement and solar panel installation.
Quote for project - 20,500.00 GHS = 1,411,00 USD
(At time of transfer in July 2024)
Janikura Village replacement water pump and solar panel installation
Project is complete!